Report NumberTitle/Additional Documents
CRC Project E-143 RFP

Brake, Tire and Road Wear Literature Review – (CRC Project No. E-143)

DEADLINE: Extended to February 16, 2024, Intent to Bid Due January 31, 2024  January 12, 2024

 

CRC Project E-144 RFP

Impacts of Alternative Diesel Fuels on OBD Robustness – (CRC Project No. E-144)

DEADLINE:  Extended to January 31, 2024 January 5, 2024

Questions and Answers (Updated 1/23/24)

 

CRC Project E-137

Fuel Correlation to SimDis Method – Analysis and Reporting (CRC Project No. E-137)

DEADLINE:  Extended to 12/8/23  11/30/23 (posted 10/24/2023)

 

CRC Project AVFL-39-2/E-139-3

Low Phosphorous Low Ash Gasoline Engine Oil to Meet Future Emission Requirements (CRC Project No. AVFL-39-2/E-139-2)

DEADLINE:  12/04/23 (posted 10/13/2023) EXTENDED TO JANUARY 12, 2024

Questions and Answers (updated 1/3/24)

 

CRC Project RW-121a

Nationwide PMI Fuel Survey (Summer & Winter) – Data Analysis and Reporting (CRC Project No. RW-121a)

DEADLINE:  9/22/23 (posted 08/23/2023) EXTENDED TO NOVEMBER 15, 2023

 Questions and Answers (posted 09/15/23)

 Questions and Answers (posted 10/20/2023, revised 10/26/23)

 

CRC Project CRC SM-CR-9

Assess the Battery-Recharging and Hydrogen-Refueling Infrastructure Needs, Costs and Timelines Required to Support Regulatory Requirements for Light-, Medium-, and Heavy-Duty Zero-Emission Vehicles– (CRC Project No. SM-CR-9)

DEADLINE:  ASAP (posted 05/18/2023) 

Questions and Answers (posted 05/24/2023)

 

CRC Project AV-31-22 RFP (revised 03/10/2023)

Microbial Test Kit Evaluation– (CRC Project No.AV-31-22) – revised 03/10/2023

Questions and Answers – 04/05/2023 

DEADLINE:  April 14, 2023 (Extended Deadline April 21, 2023)

CRC Project E-134 RFP

Light Duty PEMS Phase 3: PEMS Performance at Altitude, Grade and Low Temperature Test Program – (CRC Project No. E-134)

DEADLINE:  February 20, 2023

 

CRC Project AVFL-42 RFP

Detailed Chemical and Physical Characterization and Analysis of New Low Carbon Liquid Fuels – (CRC Project No. AVFL-42)

Addendum

Q&A Document

DEADLINE:  February 20, 2023

 

CRC Project AVFL-45 RFP

Impacts of Thermal Conditioning on Battery Packs Efficiency, Range, and GHG Reduction – Literature Review – (CRC Project No. AVFL-45)

DEADLINE:  November 13, 2022

 

CRC Project SM-LCA-17 RFP

Literature Review of Models Used for Biofuels GHG Emissions Modeling and Comparison of Results on Some Commonly Available Fuels – (CRC Project No. SM-LCA-17)

DEADLINE:  August 3, 2022

 

CRC Project SM-E-20 RFP (Deadline extended to August 17, 2022)

Carbon Return on Investment for Electrified Vehicles – (CRC Project No. SM-E-20)

DEADLINE:  Extended to August 17, 2022

CRC Project SM-E-18 RFP

V2X Requirements to Support the SAE J1634 Short Multi-Cycle Test – (CRC Project No. SM-E-18)

DEADLINE:  August 3, 2022

 

CRC Project E-140 RFP

Low NOx and NMOG – Modeling – (CRC Project No. E-140)

DEADLINE:  May 16, 2022

Q&A Document

CRC Project AV-32-22 RFP

Investigate JP-5 Vapor Pressure values in Figure 2-12 of CRC Fuel Handbook – (CRC Project No. AV-32-22)

DEADLINE:  April 11, 2022

CRC Project AV-31-22 RFP

Microbial Test Kit Evaluation – (CRC Project No. AV-31-22)

DEADLINE:  April 11, 2022

CRC Project AV-30-22 RFP

Update of Aviation Gasoline Properties using 100LL CoAs from producers, samples analyses by AFETF, and NEG data – (CRC Project No. AV-30-22)

DEADLINE:  April 11. 2022

CRC Project CM-138-21-1 RFP

Driveability Index Relevance in Modern Gasolines and Vehicles – (CRC Project No. CM-138-21-1)

DEADLINE:  November 30, 2021

CRC Project CM-136-20 RFP

Develop Precision Statements for Oxidation Stability Test Methods ASTM D525 and ASTM D7525 / Correlation Study Between Instruments For Operating Range 240-1440 Minutes – (CRC Project No. CM-136-20)

DEADLINE:  November 30, 2021

CRC Project E-134a RFP

Design of Experiments for Light Duty PEMS Phase 3: Altitude, Grade, and Low Temperature Impacts on PEMS Performance Test Program – (CRC Project No. E-134a)

DEADLINE:  November 30, 2021

CLOSED: CRC Project RW-119 RFP

Review and Evaluation of EPA’s MOVES3 Model – (CRC Project No. RW-119)

DEADLINE:  October 29, 2021

CLOSED: CRC Project AVFL-39 RFP

Lube Effect on Catalyst and Gasoline Particulate Filter Aging – Literature Review – (CRC Project No. AVFL-39)

DEADLINE:  August 20, 2021

CLOSED: CRC Project E-136 RFP

Engine, Aftertreatment, and Fuel Quality Achievements to Lower Gasoline Vehicle PM Emissions: Literature Review and Future Prospects – (CRC Project No. E-136)

DEADLINE:  July 28, 2021

CLOSED: CRC Project SM-6 RFP

Evaluation of Hydrogen Fuel Cells as a Power Source for Electric Vehicle Charging – (CRC Project No. SM-6)

DEADLINE:  July 22, 2021

CLOSED: CRC Project SM-5 RFP

Research In Support of Future Fuel Specifications – (CRC Project No. SM-5)

DEADLINE:  EXTENDED TO July 29, 2021

CLOSED CRC Project SM-4 RFP

Evaluation of the Use of EVs for Transient Grid Storage (V2G) on Battery Life – (CRC Project No. SM-4)

DEADLINE:  July 22, 2021

CLOSED: CRC Project SM-3 RFP

Evaluation of a Sample of Off-Highway Refueling Sites for Current and Potential Electrical Service to Support LD and HD EV Charging – (CRC Project No. SM-3)

DEADLINE:  July 22, 2021

CLOSED: CRC Project SM-2 RFP

Sustainability and Local Air Quality Impacts of Future Electrification and New Vehicle Emission Regulation Scenarios in the U.S – (CRC Project No. SM-2)

DEADLINE:  July 22, 2021

CLOSED: CRC Project E-135 RFP

“Tier 3 GDI Vehicle Technology Effects on Particle Emissions Operating with Different Fuels” (CRC Project No. E-135)

Q&A Document

Attachment B – Catalyst Sulphur Purge Cycle

 

DEADLINE: July 14th, 2021

CLOSED: CRC Project CM-138-21-1 RFP

UPDATED – “Driveability Index Relevance in Modern Gasolines and Vehicles”

DEADLINE: June 21, 2021.

 

CLOSED: CRC Real World Group 2022 Request for Proposals

2022 General Request for Proposals for the CRC Real World Group

 

DEADLINE: May 20, 2021.

 

CLOSED: CRC Project SM-1 RFP

Evaluate the Potential for Significant Greenhouse Gas Emission Reductions from Internal Combustion Engines Operated on Liquid Fuels Over the 2021-2030 Time Period: Literature Review and Future Prospects” (CRC Project No. SM-1)

Questions and Answers (4/15/2021) LINK:  SM_1_QA_Apr 15_2021

The deadline for submission of your proposal has been extended by two weeks to May 10, 2021

CLOSED: CRC Project CM-138-20 RFP

Development of Automated Driveability Rating System Using Trick Car” (CRC Project No. CM-138-20

 

DEADLINE:  October 2, 2020.

 

 

CLOSED: Revised CRC Project CM-136-20 RFP

“Study of Modern Gasoline Oxidation Stability and Correlation Between and Precision Updates for Oxidation Stability Tests ASTM D525/ISO 7536/IP 40 and D7525”

DEADLINE: October 2, 2020.

 

CLOSED: CRC Project CM-136-18-1 RFP

“Port Fuel Injection (PFI) Intake Valve Deposit (IVD) Test Development”

Deadline: August 21, 2020

 

 

CLOSED: CRC Project CM-136-20 RFP

“Study of Modern Gasoline Oxidation Stability and Correlation Between and Precision Updates for Oxidation Stability Tests ASTM D525/ISO 7536/IP 40 and D7525”

DEADLINE EXTENDED UNTIL JULY 29, 2020

 

CLOSED: CRC Project AV-29-20 RFP

“A Review of Current Experimental and Correlation Methods to Determine the Calorific Energy Content of Liquid Fuels”

Question #1

The title and deliverable “state energy content of liquid fuels” but (and I missed this point when reviewing!) should the scope only cover aviation liquid fuels (as per background description) or is it expected to cover grades for other applications (diesel, gasoline, marine fuels etc etc).  This needs clarifying.

Answer #1

The title was chosen to reflect the current Referee method in ASTM D1655:

‘ASTM D4809 Standard Test Method for Heat of Combustion of Liquid Hydrocarbon Fuels by Bomb Calorimeter (Precision Method).’

Appreciate the observation that the focus is on aviation fuels but useful to emphasize that a broad review is required, rather than risk implying techniques must already be aviation specific

 

Deadline: July 17, 2020

CLOSED: CRC Project AVFL-37 RFP

Thermal and Electrical Properties of Lubricants for HEV/EV Applications


Deadline: May 7, 2020

CLOSED: CRC Project AV-28-19 RFP

Feasibility Analysis: Alternative Approaches to the Replacement of ASTM D909 Supercharge Rating

 

DEADLINE EXTENDED UNTIL 10/31/19

Comments are closed.

Close Search Window